System Settings Options

From the Backstage View, you can access system settings. System settings contain options and settings that effect the entire InEight Estimate system. These settings include:

  • General settings (options)

  • Title Bars

  • Navigation Bar

  • Job Startup

  • Language

All of the settings under the Options branch are user-level settings.

The following step by step walks you through configuring general settings (options).

Step by Step — Decimal Precision

  1. With InEight Estimate open, click on the File tab to go to the Backstage view.

  2. Select Settings.

  3. Select General under Options in the node tree on the left.

  4. To activate Prompt to Save, select the Prompt to Save checkbox.

  5. Select how often you want to be prompted (in minutes).

  6. Select Decimal Precision in the tree on the left.

  7. Review the default settings.

    Units of Measure will default to English, and Currency will default to U.S. Dollar.